SMIT HEAVY LIFT EUROPE BV

Our firm is the exclusive representatives of SMIT HEAVY LIFT EUROPE BV, for Greece.
SHLE was recently involved in the construction of the Bridge joining RIO and ANTIRION (The north part of Peloponesse with the south part of Mainland Greece).
The 1600 Tonne lifting capacity self propelled sheerleg TAKLIFT 7 was used to perform difficult heavy lifts to heights of up to 170 meters.
All the steel blocks that form the tarmac surface of the bridge have been mounted succesfuly using the heavy lifting capabilities of SMIT’s self propelled sheerleg Taklift 7. The weight of each steel-road load is approx 310 tonnes and the height it has to be lifted in order to be placed and secured with the steel stantions on the bridge is approximately 67 meters.
The following photographs are self explanatory. You may click on any image thumbnail in order to open a larger photo.

HEAVY LIFT EUROPE BV
THE "STRONG" GUYS!!!

 exclusive representatives for Greece:
 
N. COTZIAS SHIPPING (RL) CO. LTD.
  7-9 AKTI MIAOULI, 185 35 PIRAEUS -  HELLAS
  TEL:+30
210 4222670 & +30 210 4222671
  FAX: +30
210 4222679 -  E-MAIL:
smit@cotzias.gr 

SMIT


















IMAGES OF THE RIO - ANTIRIO BRIDGE CONSTRUCTION PROJECT



THE LONGEST HANGING BRIDGE IN THE WORLD IS COMPLETED (AUG 2004).






















SPECTACULAR IMAGES FROM THE OPENING CEREMONY (AUG 2004).



















































SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003
SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003
SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003
SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003
SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003
SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003
SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003
SMIT - Taklift-7 Transporting prefab Steel Road for M3 Pillar - Aug 2003 SMIT - Taklift-7 Transporting prefab Steel Road for M3 Pillar - Aug 2003 SMIT - Taklift-7 Transporting prefab Steel Road for M3 Pillar - Aug 2003 SMIT - Taklift-7 Transporting prefab Steel Road for M3 Pillar - Aug 2003
Rio Antirio bridge pillars construction Aug 2003 Rio Antirio bridge pillars construction Aug 2003 Rio Antirio bridge pillars construction Aug 2003 Rio Antirio bridge pillars construction Sep 2003
M3 and M4 Pillars overview (Aug 2003) M2 and M3 and M4 Pillars overview (Aug 2003) M2 and M3 and M4 Pillars overview (Aug 2003) M4 Pillar view (Sep 2003)
Rio Antirio bridge pillars construction Sep 2003 Hevy Lift Gear Taklift7 Sep 2003 Taklift 7 lifting prefab bridge road Sep 2003 Taklift 7 lifting prefab bridge road Sep 2003
M4 and M3 Pillar view (Sep 2003) Taklift 7 Heavy Lift gear Taklift 7 lifting prefab bridge road Sep 2003 Taklift 7 lifting prefab bridge road Sep 2003
Taklift 7 lifting prefab bridge road Sep 2003 Taklift 7 lifting prefab bridge road Sep 2003 Taklift 7 lifting prefab bridge road Sep 2003  
Taklift 7 lifting prefab bridge road
Sep 2003
Taklift 7 lifting prefab bridge road
Sep 2003
Taklift 7 lifting prefab bridge road
Sep 2003
 

 
























































































SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003
SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003
SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 SMIT - Taklift-7 in Rio Antirio bridge Aug 2003 Rio Antirio bridge pillars construction Aug 2003
SMIT - Taklift-7 Lifting prefab Steel Road on M4 Pillar - Aug 2003 SMIT - Taklift-7 Transporting prefab Steel Road for M3 Pillar - Aug 2003 M2 pillar Rio side - Aug 2003
Rio Antirio bridge pillars construction Aug 2003 Rio Antirio bridge pillars construction Aug 2003 Taklift 7 in Antirion Sep 2003
M1 M2 and M3 pillars - Aug 2003 M1 pillar - Aug 2003 Taklift 7 bow view
Prefab Bridge road Sep 2003 Taklift 7 in Antirion Sep 2003 Taklift 7 in Antirion Sep 2003
Taklift 7 lifting prefab bridge road
Sep 2003
Taklift 7 side view Taklift 7 deck view
Prefab Bridge road Sep 2003 Prefab Bridge road Sep 2003 Rio Antirio bridge pillars shock absorbers Sep 2003
Taklift 7 lifting prefab bridge road
Sep 2003
Taklift 7 lifting prefab bridge road site Antirio
Sep 2003
North Side Antirio Bridge Shock Absorbers
Sep 2003
Rio Antirio bridge M4 and M3 pillars Sep 2003 Rio Antirio bridge M4 and M3 pillars Sep 2003 Rio Antirio bridge M4 & M3 & M2 pillars Sep 2003
M4 Pillar with its 19 pieces of prefab road installed Sep 2003 M4 and M3 pillars - Sep 2003 M4 M3 and M2 pillars - Sep 2003
Rio Antirio bridge M4 pillar Sep 2003 Rio Antirio bridge M4 & M3 & M2 pillars Sep 2003 Rio Antirio Taklift 7 Sep 2003
M4 Pillar with its 19 pieces of prefab road installed Sep 2003 M4 M3 and M2 pillars - Sep 2003 Taklift 7 lifting prefab bridge road
Sep 2003
Rio Antirio bridge M4 & M3 & M2 pillars Sep 2003 Rio Antirio bridge M4 pillar Sep 2003 Rio Antirio bridge M4 & M3 pillars Sep 2003
M4 M3 and M2 pillars - Sep 2003 M4 Pillar close-up of road construction - Sep 2003 M4 M3 and M2 pillars - Sep 2003
Rio Antirio Taklift 7 Sep 2003 Prefab Bridge road Sep 2003 Hevy Lift Gear Taklift7 Sep 2003
Taklift 7 Heavy Lift gear Taklift 7 lifting prefab bridge road site Rio Sep 2003 Taklift 7 Heavy Lift gear

Prefab Bridge road Sep 2003

Rio Antirio bridge M4 and M3 pillars Sep 2003

Rio Antirio Taklift7 & SHLE unit Sep 2003

Taklift 7 lifting prefab bridge road
Sep 2003
M4 Pillar with its 19 pieces of prefab road installed Sep 2003 Taklift 7 Heavy Lift and utility Vehicle -
Sep 2003
Rio Antirio bridge M4 and M3 pillars Sep 2003 Rio Antirio bridge M4 and M3 pillars Sep 2003 Rio Antirio bridge M4 and M3 pillars Sep 2003
M4 and M3 pillars overview -
Sep 2003
M4 and M3 and M2 pillars overview -
Sep 2003
M4 Pillar overview -
Sep 2003

Rio Antirio Taklift 7 Sep 2003

Prefab Bridge road Sep 2003

 

Taklift 7 side view

Taklift 7 lifting prefab bridge road Sep 2003